3-5-ETS1-3 Engineering Fair Tests & Failure Points
Plan and carry out fair tests in which variables are controlled and failure points are considered to identify aspects of a model or prototype that can be improved.
Teach 3-5-ETS1-3 with a mystery

Coming soon to TPT





